Rehabilitation & extension of water supply systems, including construction of potable water treatment plant, reservoir, pumping station & lifting pipe line. The work comprising the following: Construction (design, presses, implementation) of rapid sand filter water treatment plant with a capacity of 26,000 m3/per day. Construction of ground reservoir with a capacity of 2,240 m3. Construction of a pumping station equipped with 16 vertical axial booster pump set, each has a capacity of Q=120 m3/per hr, TMH=600 m. Installation of chlorination unit. A new lifting pipe line with a total length of 3.6 km of DI pipes of 20 inches.
Rehabilitation of the existing lifting pipe line 12 & 10 inch dia. Construction 0f 2 km access road including excavation, pavement, asphalting & retaining walls. rehabilitation of existing transformer & control panel rooms and the design of new arrangement for the new electrical transformers equipment and suppliers.
Value
$20,200,000Client
Council for Development and Reconstruction (CDR), Tallet El Serail,Consultant
ASACO S.a.r.L.Location
LebanonCompletion Date
Aug 2011