• svg
  • svg
  • svg
  • svg

Head Office in New-York

775 New York Ave, Brooklyn, NY 11203

Request a Quote

Looking for a quality and affordable builder for your next project?

* Please Fill Required Fields *
img

Toll Free

1-800-987-6543

Working Hours

We are happy to meet you during our working hours. Please make an appointment.

    • svg
    • svg
    • svg
    • svg

    Head Office in New-York

    775 New York Ave, Brooklyn, NY 11203

    Request a Quote

    Looking for a quality and affordable builder for your next project?

    * Please Fill Required Fields *
    img

    Toll Free

    1-800-987-6543

    Working Hours

    We are happy to meet you during our working hours. Please make an appointment.

    Upgrade of Storm Water Drainage – Part of the Dubai International Airport Expansion Project, Dubai, U.A.E.

    Package -1

    WO-034: West Pond Pump Station SDP-West and Associated Drainage Works (Protection of existing utilities and relocation works. Rehabilitation and maintenance works for the existing lifting station, new storm water drainage pump station and relevant oil interceptor with capacity of 6.25 m3/sec to discharge the storm water flow from the west detention ponds towards the upgraded new storm drainage pump station 6 located under the airfield and land-side roads. Installation of new distribution chamber to facilitate storm water distribution.

    Package – 2

    WO032: Upgrading of Storm water Pump Station SDP-6. Upgrading of storm water pump station tp 10 m3/sec to cater for the increased flows conveyed from proposed pump station to ne constructed near the west detention. This will be achieved by fully dismantling the existing electro mechanical installation and demolition of existing civil works and constructing of a new sub/super structure on the same site. The existing 1600 mm outfall from SDP-6 to Dubai Creek will be maintained and its condition will be surveyed to assess the pipe conditions and the necessity/extent of any required rehabilitation. Based on the outcome of the outfall condition survey, necessity of in-situ rehabilitation to the existing outfall to be decided to ensure its convenience to sustain higher flow velocities.

    Package – 3

    WO-031: Upgrading of SCADA System for storm water drainage and sewerage, the site survey, electro-mechanical design, procurement, testing, packing and shipping, installation, commissioning and training works necessary to upgrade the storm water/sewerage SCADA system.

    Package – 4

    WO030 : Upgrading of Storm water Pump Station SDP-A, pump stationm’A’ (P.STN’A’) is one of the most important storm water drainage facilities at Dubai International Airport it drains an overall catchment area of 1,132 hectares to dubai Creek via 1800/2400 mm rising main. the are has a total of 5 duty pumping units without any standby units. The main objective of this project is to upgrade P.STN.’A’ by replacing the existing units with larger pumps including a single standby unit. The works include the necessary upgrade of pump station ‘A’, new transformer room, modification of existing transformer and MCC room in addition to all temporary facilities

    • Value

      $107,371,016
    • Client

      Department of Civil Aviation
    • Consultant

      Dar Al-Handasah (Shair & Partners)
    • Location

      United Arab Emirates
    • Completion

      2019