Construction of two (2) roads on each side of the river and construction of bridge connecting these roads. Major work items: Pre-stressed concrete bridge: 3 spans of 17 m each, total length: 51 m, width: 11 m, pre-stressed beams: 12 beams of 17 m length for each span, totaling 36 beams. Cast-insitu slab binding all the beams with expansion joints, concrete: 950 m3 (excluding pre-stressed beams), reinforcement: 125 tons, Rock armour: 1,200 m3 for protection works.
Roads, roundabouts and parking: road length: 1.2 km, 3 no. roundabouts and car parking facility for 125 cars. excavation: 11,000 m3, fill: 26,000 m3, sub-base: 4,100 m3, road-base: 3,400 m3, asphalt: 11,000 m2 and concrete drains: 1,200 m.
Value
$6,630,000Client
'Ministry of Public works & Infrastructural Development, Technical Services DivisionConsultant
Dessau-Soprin International, CanadaLocation
Commonwealth of DominicaCompletion Date
May 2010