Earth Works;
Earthworks, including excavation and embankment, contains: Road (6) (ST: 1+000 TO ST: 11+700); Cumulative Fill = 986,839.16 m3; Cumulative Cut = 49,579.61 m3; Road (5) (ST: 1+000 TO ST: 19+780); Cumulative Fill = 1,118,908.30 m3; Cumulative Cut = 440,727.82 m3; Road (4) (ST: 1+250 TO ST: 23+350); Cumulative Fill = 1,823,727.22 m3; Cumulative Cut = 219,506.69 m3
Road Works;
Construction and maintenance of temporary traffic detours necessary for the construction of other works. Demolition of existing pavement. Construction of temporary fence. Roadway work of (51,408 m) including sub-base and base courses, asphalt works, metal works and any other requirements to complete work. Construction of dual (3-lanes and 4-lanes) expressways including parallel collector distributor roads 2 lanes.
Utilities Works;
Construction of culvert for KOC pipelines protection. Construction of a storm water drainage network, including pump stations, culverts, pipes, manholes and gullies. Protection, relocation and construction of water pipelines, sanitary sewers. Protection, relocation and construction of irrigation work including pipes, valves, fittings.
Electrical Works & Instrumentation;
Protection, relocation and construction of electricity network 11kv. Construction of the necessary civil works for the relocation/protection of 33kv electric cables, and coordination with responsible authorities for the required relocation. Electrical work including cables, road crossing ducts, UPVC LT ducts, earth bonding & grounding. Construction of the necessary civil works for the relocation/protection of telephone cables, interfering with the works, and coordination with responsible authorities for the required relocation. Telephone work including UPVC ducts/pipes, manholes, optical fiber cable and sub duct (3×32+2×25) mm. Street Lighting work including cable trays, lighting columns, overhead guide signs, control cabinets. Traffic control system including ATC ducts, Fiber optic cable, CCTV camera, Speed camera system, VMS system, accident detection system.
Finishing & Landscape;
Removal and planting of palms, and removal and disposal for trees and shrubs interfering with the works. Road works, including pavement, sidewalks, signing and marking and concrete barriers
Bridge works;
139 m bridge for Interchange (IC 8). 50 meter bridge for Interchange (IC 7). Concrete works for bridges including blinding, combined footing, piers, retaining wall, abutments, precast parapet. Installation of pot bearing for abutment and piers, pre-stressed strands and pre-stressed concrete deck slab.
Value
$151,882,852Client
Ministry Of Public WorksConsultant
Dar Al Handasah (Shair & Partners)Location
KuwaitCompletion
2019