• svg
  • svg
  • svg
  • svg

Head Office in New-York

775 New York Ave, Brooklyn, NY 11203

Request a Quote

Looking for a quality and affordable builder for your next project?

* Please Fill Required Fields *
img

Toll Free

1-800-987-6543

Working Hours

We are happy to meet you during our working hours. Please make an appointment.

    • svg
    • svg
    • svg
    • svg

    Head Office in New-York

    775 New York Ave, Brooklyn, NY 11203

    Request a Quote

    Looking for a quality and affordable builder for your next project?

    * Please Fill Required Fields *
    img

    Toll Free

    1-800-987-6543

    Working Hours

    We are happy to meet you during our working hours. Please make an appointment.

    Rehabilitation of Existing Buildings, Electrical Power Supply, Operation & Maintenance of Taybeh Water Treatment Project (Part 2), Lebanon

    Rehabilitation & extension of water supply systems, including construction of potable water treatment plant, reservoir, pumping station & lifting pipe line. The work comprising the following: Construction (design, presses, implementation) of rapid sand filter water treatment plant with a capacity of 26,000 m3/per day. Construction of ground reservoir with a capacity of 2,240 m3. Construction of a pumping station equipped with 16 vertical axial boosters pump set each has a capacity of Q=120 m3/Hour. TMH=600 m.

    Installation of chlorination unit. A new lifting pipe line with a total length of 36 km of Ductile Iron pipes of 20 inch dia. Construction of 2 km access road including excavation, pavement, asphalting & retaining walls. Rehabilitation of existing transformer & control panel rooms and the design of new arrangement for new electrical transformers equipment and suppliers (Phase 2).

    • Value

      $6,850,450
    • Client

      Council for Development and Reconstruction (CDR),
    • Consultant

      ASACO S.a.r.L,
    • Location

      Lebanon
    • Completion Date

      Aug 2011