Logistics District of Dubai South – Construction Works package for 12 buildings, U.A.E.
Construction Works package for 12 buildings in Staff Village Phase 1b Bonded Area on Plot-1 (SD_63), Plot-2 (SD_62), Plot-3 (SD_61) & Plot-4
775 New York Ave, Brooklyn, NY 11203
Looking for a quality and affordable builder for your next project?
We are happy to meet you during our working hours. Please make an appointment.
Construction Works package for 12 buildings in Staff Village Phase 1b Bonded Area on Plot-1 (SD_63), Plot-2 (SD_62), Plot-3 (SD_61) & Plot-4
The Scope of Works includes the main construction works for the roads and utilities – scope of each package comprises ground investigation
Design, Construction, Completion, testing, commissioning and maintenance of 388 No. Villas and infrastructure and related works.
Development of 98 hectares for mixed use (residential and commercial) comprising of 284 plots and 111 units (Lombardy Lakes) and commercial area
Package -1 WO-034: West Pond Pump Station SDP-West and Associated Drainage Works (Protection of existing utilities and relocation works. Rehabilitation and maintenance
Upgrading / replacement of existing irrigation system standalone conventional controllers with radio-operated satellite compatible with the RC L&I central control system. Installation
Main network consist of supply, install, excavation, GRP pipes of dia. 600-1200mm, length 28.72 km, HDPE pipe dia. 250mm 120.00 km connected
The Aley Commercial Center has 26,365 m2 of built up area presenting a variety of prestigious retail, leisure, office space and other
Main network consist of supply, install, excavation, GRP pipes of dia. 600-1200mm: length 25320 LM, pump station consists of 6 pumps each
Civil, architectural, equipment, conveying system, mechanical and electrical works & maintenance of Wafra Mall, a 24 floors commercial building consists of 2