Design, construction, completion and maintenance of the Administration Building (71,921 m2), Car park (79,182 m2), and Fire Station (9,710 m2). Major works include earthworks, concrete, masonry, metal works, thermal and moisture protection, doors, windows, finishing works, specialties, equipment, furnishing, conveying systems, mechanical & electrical installations, site clearance, site formation, excavation, shoring, de-watering and back-filling works, underground services, landscaping (77,299 m2), irrigation, tile work (54,937 m2), carpet flooring (38,600 m2), access flooring (55,000 m2), ceiling: 50,350 m2, plaster work: 81,000 m2, gypsum works: 7,400 m2, terrazo works: 18,469 m2, granite & marble: 12,500 m2, limestone works: 22,500 m2, painting area: 413,000 m2, epoxy coating: 94,000 m2, provide auditorium seating: 242 seats capacity; contractor’s site laboratory, testing equipment & facilities; kitchen equipment, window washing systems, conveying systems, furnishings and all electro-mechanical works , steel: 4,720 tons, concrete: 100,592 m3.
Value
$166,942,000Client
Directorate General of Civil AviationConsultant
Jassim Qabazard Engineering ConsultantsLocation
KuwaitCompletion
2018