Project Posts – MAK-Mohammed Abdulmohsin Al-Kharafi & Sons https://malkharafi.com Building the elements of life. Tue, 13 Feb 2024 19:17:57 +0000 en hourly 1 https://wordpress.org/?v=6.4.3 https://2xmaa8.p3cdn1.secureserver.net/wp-content/uploads/2020/10/cropped-Favicom-32x32.jpg Project Posts – MAK-Mohammed Abdulmohsin Al-Kharafi & Sons https://malkharafi.com 32 32 Central Bank of Kuwait https://malkharafi.com/myproject/central-bank-of-kuwait/ Mon, 08 Jul 2019 05:59:38 +0000 https://mak.nji.ylj.mybluehost.me/?post_type=constructify-project&p=1757 The Central Bank of Kuwait building will become a new landmark on Kuwait City’s skyline, acting as a symbol of the country’s significant economic power and contribution to the region.

The triangular, truncated pyramid tower is intersected by a podium that contains reception and banking halls, conference facilities, dining and banquet rooms, and a museum.

The two stone walls of the southern, city-facing tower reduce energy consumption by functioning as a heat sink to absorb the harsh Kuwaiti sun during the day and use the stored heat to keep away the cold at night.  An all-glass northern elevation protects the interior from solar gain while providing panoramic views across the Arabian Gulf. At night, the top of the building will glow like a beacon and add a significant presence to the Kuwait skyline.

]]>
New Jahra Hospital https://malkharafi.com/myproject/new-jahra-hospital/ Mon, 08 Jul 2019 05:59:24 +0000 https://mak.nji.ylj.mybluehost.me/?post_type=constructify-project&p=1756 New Jahra Hospital is a medical complex located 30 kilometers west of Kuwait City, in Al Jahra. It consists of the Main Hospital building, Dental Clinic, Regional Health Administration building, Central Utility Plant and two car park buildings.

The Main Hospital building is on a 67,000 m2 area plot, with a total area of approximately 466,000 m2. It has 1903 beds, includes a full range of services and will function as a Trauma Center for the Jahra district. It is organized around a five-story atrium. Major diagnostic and treatment programs and outpatient programs are located on the west side of the atrium. Inpatient bed wings are 14 stories tall, located on the east side of the atrium. Internal service corridors and bridges allow for horizontal inpatient transfer and service functions.

Major departments include: Accident and Emergency with Helipad on the roof and separate Adult and Pediatric treatment areas; over 20 Outpatient Clinics; Outpatient Procedures including Endoscopy, Pulmonary and Cardiology; Radiology and Nuclear Medicine; Same Day Medical observation unit; a modern Surgical suite with 20 OR’s including 2 hybrid rooms; a Women’s Center including Women’s Inpatient beds include Adult, Pediatric and Women’s Center beds as well as 12 unique ICU bed units.

  • Dental Clinic is on a 6,000 m2 area plot with a total built-up area of approximately 31,000 m2. It contains one underground level, a ground floor, and 3 stories.

  • Regional Health Administration building is on a 1,900 m2 area plot with a total area of approximately 5,700 m2. It contains one underground level, a ground floor and 2 stories.

  • Central Utility Plant is on a 8,000 m2 area plot with a total area of approximately 24,000 m2. It contains one underground level, a ground floor and 1 floor.

  • Car Park 1 building is on a 15,000 m2 area plot with a total area of approximately 121,000 m2. It contains one underground level, a ground floor and 6 stories.

  • Car Park 2 building is on a 9,000 m2 area plot with a total area of approximately 72,000 m2. It contains one underground level, a ground floor and 6 stories.

]]>
Al-Jahra Court Complex, Al-Jahra, Kuwait https://malkharafi.com/myproject/al-jahra-court-complex-al-jahra-kuwait/ Mon, 08 Jul 2019 05:59:15 +0000 https://mak.nji.ylj.mybluehost.me/?post_type=constructify-project&p=1755 Construction, completion, furnishing, operation and maintenance of Al-Jahra Court Complex on total 10,000 m2 plot area and the total built-up area is 95,026 m2 approximately. A state-of-art high quality building consisting of the three basement levels, ground floor and sixteen floors above the ground floor. The building comprises of a Supreme Court, Administration, Criminal and General Prosecution Departments. Car Park Building on total 5,000 m2 plot area and the total built-up area is 104,869 m2: The combined automated and conventional car park building consists of three basement levels, ground floor, and five floors above ground floor are for the conventional car park facility consisting of 646 car parking spaces. The fourteen floors above the fifth floor are for the automated car parking facility consisting of 2’280 car parking spaces.

Quantities for major items:

Reinforced cast insitu concrete (beams, walls): 39,836 m3; Reinforced concrete suspended slabs: 79,367 m2; Concrete topping: 25,092 m2; Block works: 78,031 m2; Stone flooring: 27,994 m2; Terrazzo Flooring (including under carpet): 34,489 m2; Carpet floor: 32,748 m2; Accoustic tiles & ceilings: 29,529 m2; Metal ceilings: 12,976 m2; External stone cladding: 10,562 m2; External Terracotta tile cladding: 6,438 m2; Internal cement plastering: 49,466 m2; Internal gypsum board partitions: 18,568 m2; Internal wood cladding: 8,129 m2; Internal stone cladding: 22,676 m2; Acoustic wall panels: 10,687 m2; Electric generators: 3 no.; Centrifugal water chillers: 4 no.; Glycol water chillers: 4 no.; Cooling Towers: 11 no.s; Packaged Air Handling Units (AHU): 161 no.; Fan Coil Units (FCU): 62 no.

]]>
Addis Ababa International Airport Project – Works Package II, Addis Ababa, Ethiopia https://malkharafi.com/myproject/addis-ababa-international-airport-project-works-package-ii-addis-ababa-ethiopia/ Mon, 08 Apr 2019 12:17:09 +0000 https://mak.nji.ylj.mybluehost.me/?post_type=constructify-project&p=1720 Construction of a new international terminal building of 60,000 M2 on 3 floors, Facilities include check-in, security, passport control customs, baggage handling system with fully automated 100% hold baggage screening, restaurants and bars, duty-free shopping and lounges, and 5 aircraft boarding bridges, offices for airlines and airport management and operational personnel within the terminal building.

Major Quantities: Terminal Building (Structures) Fill: 26,000 M3; Piles: 920 No.; Concrete: 25,000 M3; Rebar: 2,500 Tonnes; Foamwork: 70,000 M2; Structural Steel: 350 Tonnes (Envelope): Glass/Metal Cladding Façade: 15,000 M2; Space Frame Roof: 30,000 M2 (Mechanical & Electrical): Standpipe and Sprinkler system; Domestic hot and cold water supply, Roof drainage system, Fully automatic ventillation system, Incoming 100% HBS, Four arrivals collection carousels; Xray Screening: Two in-line Vivid X-rays with OOG; Loading Dock Levellers: 2 No.; Elevators: 4 No.; Escalators: 12 No.; Airbridges: 5 No.; Flight Information Display System: 30 No.; Security System – Card readers and keypads on landside/airside line and all secure areas; TMRS, CCTV: 20 No. Apron (Civil Works): Excavation: 185,000 M3; Fill: 150,000 M3; Crushed Aggregate Layers: 65,000 M3; Asphalt: 15,000 M3; PQ Concrete: 16,000 M3; Earth Static Grounding System

Construction of new 80,000 M2 airside aircraft apron and taxiway in PQ concrete and asphalt. Construction of landside carparking facilities, access roads and pedestrian walkways. Construction of new fire and potable water supply and storage facilities, sewerage and storm water drainage facilities.

HV mains and substations, Emergency Standby Generators, Normal and standby Emergency Lighting, fully automatic fire alarm system (Finishes): Stainless Steel Staircase: 12 No.; Partitions: 3,000 lm; Ceramic Tiles: 3,000 M2; Marble Tiles: 40,000 M2; Ceilings: 20,000 M2; Paint: 75,000 M2; Seating: 625 Nos (Accessories): Signage: 150 No.; Airport Counters: 82 No.; Baggage Handling System: Two line departures system with “Car Park and Access Roads (Civil Works): Fill: 150,000 M3; Crushed Aggregate Layers: 20,000 M3; Asphalt: 8,000 M3; Concrete walkways, ramps, structures: 15,000 M3; Drainage: 3,000 lm; Kerbs: 16,000 lm; Topsoil: 10,000 M3; Grass seeding: 60,000 M2; Trees, Plnats, Shrubs: 12,000 No.; Guardbooths: 5 No.; Access Barriers: 6 No; Guardrails: 500 lm; Roadsigns: 25 No.; Flagpoles: 18 No.; Streetlighting: 60 No., etc.. Passenger Capacity 3000 per hour.

Widening of existing Runway and Taxiway, reconstruction of existing cross taxiway & parts Runway, Taxiway, Apron & Shoulders. Major Quantities: Covered by this contract are: – Removal & disposal of existing pavement: 6,200 M3. – Bitumenous levelling: 18,250 Tons. – Bitumenous base course & surface course: 68,640 Tons; – Bitumenous surface course for overlay: 67,370 Tons. ”

 

 

]]>
Marsa Alam International Airport – Construction of Terminal building and ancillary support buildings, Airport runway, Taxiway, Access roads & Associated Works https://malkharafi.com/myproject/marsa-alam-airport-construction-of-terminal-building-and-ancillary-support-buildings-bot-project-marsa-alam-egypt/ Wed, 13 Mar 2019 10:43:01 +0000 https://mak.nji.ylj.mybluehost.me/?post_type=constructify-project&p=1682 “Construction of Terminal building and ancillary support buildings, Airport runway, Taxiway, Access roads & Associated Works – Terminal Building with restaurants, cafeterias, airline offices, car rentals, banks and first aid and Duty Free Shop, car parking and landscaping.

Terminal building built-up area of 13,000 M2, to accommodate 1,300 Passengers/ hr. 12 Aircraft Stands, 100,800 M2 Concrete Slab of Apron 40 cm thickness – PCN 57 / R / A / W / T. Runway with capability of handling various aircrafts RWY 3,243 m x 45 m -160,000 M2 Asphalt. PCN: 54 / FIA / A / W / T ASPH. Tripartite Taxiways 1,100mx23 m-83,600M2 Asphalt – PCN : 54 / F / A / W / T ASPH; CAT 7 firefighting facilities, CAT – 1 Airport Lighting, and Navigation Aids DVOR- DME. 243,600 m2 apron asphalt & taxiways; 100,800 m2 apron concrete pavement.”

]]>
Al Qassim Firing Ranges Project, Saudi Arabia https://malkharafi.com/myproject/al-qassim-firing-ranges-project/ Mon, 15 Oct 2018 10:59:17 +0000 https://mak.nji.ylj.mybluehost.me/?post_type=constructify-project&p=535 The scope includes: Infrastructure works (60km x 7m Asphalt road, 155 Km security fence, 122 Km earth berm) and structure building (offices, dinning hall, Mosque, underground and elevated water tank, guard house and observation towers.)

]]>
Road Works and Storm Water Drainage Network – Sabah Al Ahmad, Al Khiran, Kuwait https://malkharafi.com/myproject/road-works-storm-water-drainage-network-sabah-al-ahmad-al-khiran/ Mon, 08 Oct 2018 11:33:26 +0000 https://mak.nji.ylj.mybluehost.me/?post_type=constructify-project&p=541 Earth Works;

Earthworks, including excavation and embankment, contains: Road (6) (ST: 1+000 TO ST: 11+700); Cumulative Fill = 986,839.16 m3; Cumulative Cut = 49,579.61 m3; Road (5) (ST: 1+000 TO ST: 19+780); Cumulative Fill = 1,118,908.30 m3; Cumulative Cut = 440,727.82 m3; Road (4) (ST: 1+250 TO ST: 23+350); Cumulative Fill = 1,823,727.22 m3; Cumulative Cut = 219,506.69 m3

Road Works;

Construction and maintenance of temporary traffic detours necessary for the construction of other works. Demolition of existing pavement. Construction of temporary fence. Roadway work of (51,408 m) including sub-base and base courses, asphalt works, metal works and any other requirements to complete work. Construction of dual (3-lanes and 4-lanes) expressways including parallel collector distributor roads 2 lanes.

Utilities Works;

Construction of culvert for KOC pipelines protection. Construction of a storm water drainage network, including pump stations, culverts, pipes, manholes and gullies. Protection, relocation and construction of water pipelines, sanitary sewers. Protection, relocation and construction of irrigation work including pipes, valves, fittings.

Electrical Works & Instrumentation;

Protection, relocation and construction of electricity network 11kv. Construction of the necessary civil works for the relocation/protection of 33kv electric cables, and coordination with responsible authorities for the required relocation. Electrical work including cables, road crossing ducts, UPVC LT ducts, earth bonding & grounding. Construction of the necessary civil works for the relocation/protection of telephone cables, interfering with the works, and coordination with responsible authorities for the required relocation. Telephone work including UPVC ducts/pipes, manholes, optical fiber cable and sub duct (3×32+2×25) mm. Street Lighting work including cable trays, lighting columns, overhead guide signs, control cabinets. Traffic control system including ATC ducts, Fiber optic cable, CCTV camera, Speed camera system, VMS system, accident detection system.

Finishing & Landscape;

Removal and planting of palms, and removal and disposal for trees and shrubs interfering with the works. Road works, including pavement, sidewalks, signing and marking and concrete barriers

Bridge works;

139 m bridge for Interchange (IC 8). 50 meter bridge for Interchange (IC 7). Concrete works for bridges including blinding, combined footing, piers, retaining wall, abutments, precast parapet. Installation of pot bearing for abutment and piers, pre-stressed strands and pre-stressed concrete deck slab.

]]>
Bid Pack 3A Central Utility Plants 1 & 2 including Ancillary Buildings, Sabah Al Salem University City, Kuwait https://malkharafi.com/myproject/bid-pack-3a-central-utility-plants-1-2-including-ancillary-buildings-sabah-al-salem-university-city/ Mon, 08 Oct 2018 11:31:35 +0000 https://mak.nji.ylj.mybluehost.me/?post_type=constructify-project&p=550 Construction, testing, pre-commissioning, commissioning and operation and maintenance of Central Utility Plants (1 & 2) including ancillary buildings and utility service tunnel.

The scope of works includes;

Civil, Mechanical & Electrical for the Central Utility Plants 1 & 2 and the ancillary buildings including water tanks, treated sewage effluent tank, cooling towers, etc. district cooling system including chilled water pipes, pumps, condensers, etc.

Firefighting system including sprinklers, hose reels, landing valves etc.  Plumbing system including cold water hot water, drainage, and associated works. Metal works such as cable trays. Cladding and steel structure for CUP 1 & 2 – cooling towers, thermal energy storage, electrical sub-stations, fuel oil storage. Domestic water tanks. Central Utility Plants are two identical buildings 27,500 m2 in area and 22 m in height. 18 nos Chillers x 2,000 TR=36,000 TR; 18 Nos. Cooling Towers Cells; 13 nos. RCC water tanks 23,100 m3; TES Tank with 30m Dia. & 15m Height; RO. Plant with in-fluent flow 10,800 m3/day; 1,250 tons steel structure works (roofing); 5 nos. 3.3 KVA Diesel Generators; 8 nos. 415 V Diesel Generators.

Major Quantities;

Excavation: 462,250 m3; Reinforced Concrete: 96,000 m3; Rebar: 14,850 tons; Steel Structure for roofing: 2,500 tons; Water Proofing: 45,000 m2 & Steel Structure for pipe support: 1,150 tons

]]>
Design, Construction, Completion and Maintenance for Seif Palace – Extension Works, Kuwait https://malkharafi.com/myproject/design-construction-completion-and-maintenance-for-seif-palace-extension-works/ Mon, 08 Oct 2018 11:28:07 +0000 https://mak.nji.ylj.mybluehost.me/?post_type=constructify-project&p=554 Design, Construction, Completion and Maintenance for Seif Palace (Council of Ministers) extension of main building

]]>
Construction Completion Maintenance of Marine Works for Funaitees Club, Kuwait https://malkharafi.com/myproject/construction-completion-maintenance-of-marine-works-for-funaitees-club/ Mon, 08 Oct 2018 11:27:00 +0000 https://mak.nji.ylj.mybluehost.me/?post_type=constructify-project&p=555 Marine Works

]]>