Re-construction of a new road 102 km long, 2 lanes – Dual Carriageway (6.7 m wide + 1.5 m shoulders).
Major Quantities:
Earthworks 1,000,000 m3; Base/Sub-base: 360,000 m3; Bitumen for double surface treatment: 3070 m3; Concrete Works for culverts and bridges 17,000 m3; Steel Reinforcement 2000 tons; Rip rap and stones 40,000 m3; Roads signs and road markings.
Value
$57,093,386Client
Ministry of Transport and Public WorksConsultant
United Engineering & Technical Consultants LtdLocation
MalawiCompletion
2009