Construction Of the National Road RN 14 between Tadjourah and Obock (62 KM) and asphalt concrete pavement for resurfacing on the road RN9 from the round about with RN11 road and Tadjourah (9 km) – Excavation and disposal or reuse of material 200 000 m3, excavation of rocks 100 000 m3, back-filling 230 000 m3, alluvial aggregate for sub-base and shoulders 39 000 m3, selected natural aggregate for sub-base and shoulders 50 000 m3, crushed aggregate 0/31.5mm for base and shoulders 114 000 m3, asphalt pavement 27 800m3, gabions 16 000 m3, drainage culverts different types 600 LM, Irish Bridges 2400 LM, road signs and road markings.
Value
$26,524,000Client
Ministry of Equipment and TransportsConsultant
Pan Arab Consulting EngineeringLocation
DjiboutiCompletion
2009