Construction of an asphalt road 9 m wide and 110 km long, works comprise of the reinforced concrete structures for culverts and platforms as well as the security structures, signage and road marking.
Major Quantities
Excavation: 710,170 m3; Backfill: 1,023,083 m3; Form Layer: 195,000 m3; Foundation Layer: 200,000 m3; Sub-base layer: 40,935 m3; Base Layer: 160,000 m3; Asphalt layers: 203,870 m3; Coating: 760,000 m2; Pavement: 38,000 m3; Concrete: 37,715 m3; Rebar: 1,973 tons; Gabions: 27,316 m3; Guard rail: 24,823 m.
Value
$149,560,367Client
Ministry of Equipment and TransportConsultant
Pan Arab Consulting Engineers W.L.L. (PACE)Location
DjiboutiCompletion
2018