Total Site Area Approx. 1,265,000 m2 – Development of infrastructure for housing project includes roads, pavings, utilities, water supply, storm water, sanitary sewer, electrical works and telecommunications etc
Major Quantities:
Embankments: 42,650 m3; Road Sub-Grade; Sub-Base: 103,723 m3; Aggregate Base Course: 56,106 m3; Concrete Tiles: 202,795 m2; Asphalt Work: 51,708 tons; kerb stones: 85,850 m; Road Signs: 776 No; Safety Fence 2,150 M; MDPE Pipe – 20-63 mm: 21,096 M; DI Pipe – 150-300 mm: 13,728 M; Sewer Pipe line in trench depth 1-14 m: 28,760 M; Manholes: 736 no.; Inspection Chambers: 1,307 no.; Storm Water Pipe in trench depth 1-4.5 m: 39,811 M; Junction Box & Manholes: 1,075 no.; Telecommunication ducts 33 & 100 mm: 441,273; Gullies: 2,149 no.; Manholes: 568 no.; 11/04 kva sub-stations: 88 no.; 11 kva cable: 29,403 m; Low Voltage cables: 92,333 m; Street light poles: 712 no.; Traffic signals: 4 Jn
Value
$67,433,000Client
Ministry of HousingConsultant
Ministry of HousingLocation
BahrainCompletion
2018