Power & Energy – MAK-Mohammed Abdulmohsin Al-Kharafi & Sons https://malkharafi.com Building the elements of life. Tue, 13 Feb 2024 18:44:10 +0000 en hourly 1 https://wordpress.org/?v=6.4.3 https://2xmaa8.p3cdn1.secureserver.net/wp-content/uploads/2020/10/cropped-Favicom-32x32.jpg Power & Energy – MAK-Mohammed Abdulmohsin Al-Kharafi & Sons https://malkharafi.com 32 32 Ethylene Glycol Project (EG-2) at Shuaiba https://malkharafi.com/myproject/ethylene-glycol-project-eg-2-at-shuaiba-kuwait-epc-contractor-world-services-italia-civil-works-contractor-m-a-al-kharafi-sons-wll/ Wed, 03 Oct 2018 12:42:05 +0000 https://mak.nji.ylj.mybluehost.me/?post_type=constructify-project&p=731 Civil works for the EG-2 Plant consisting of earthworks (61,000 m3), concrete works (18,000 m3), grouting, waterproofing, drainage works, building and miscellaneous civil works.

]]>
Aromatics Complex Project at Shuaiba, Contract No. KARO/1/2005 https://malkharafi.com/myproject/aromatics-complex-project-at-shuaiba-contract-no-karo-1-2005-kuwait-epc-contractor-technimont-italy-skec-south-korea-main-contractor-technimont-kharafi-national-civil-works-part-s/ Wed, 03 Oct 2018 11:28:48 +0000 https://mak.nji.ylj.mybluehost.me/?post_type=constructify-project&p=602 Civil works for the new Aromatics Plant consisting of earthworks (165,000 m3), roads, concrete (132,400 m3), slope protection works, waterproofing and miscellaneous civil works.

]]>
Shuaiba North Co-Generation (Power/Distillation) Plant – Onshore Civil Works, Order No. 4200043026/FIO, Shuaiba https://malkharafi.com/myproject/shuaiba-north-co-generation-power-distillation-plant-onshore-civil-works-order-no-4200043026-fio-shuaiba/ Wed, 03 Oct 2018 11:28:21 +0000 https://mak.nji.ylj.mybluehost.me/?post_type=constructify-project&p=603 Onshore civil works and services related to the Shuaiba North Co-Generation (Power/Distillation) Plant, site area preparation, mobilization, contractor’s site facilities, onshore civil works for desalination units and auxiliaries, sea water intake, screening & pumping station reinforced concrete structure & header pit, outfall structure & scour protection, re-carbonation plant, chlorination plant building & chlorine gas cylinder unloading/storage area, emergency chlorine gas scrubber building, intake area electrical building, foam building, limestone storage building, CO2 gas compressor building, air compressor building, distillation sub-station Buildings A & B, local switch-gear rooms (5 no.), analyzer rooms, roads & yards, car park (shaded), electrification, landscaping & irrigation system, storm-water system, oily/foul & chemical sewer system, fire fighting system, road lighting and fencing works.

The project’s major quantities includes (but not limited to) the following:

Excavation/Fill: circa 36,000 m3, GRP: 15 tons, RC: 36,000 m3, steel structure: 380 tons, plaster: 10,000 m2, surface hardener: 86,000 m2, road work: 43,000 m2, concrete pavement: 35,000 m2, Galvanized steel/PVC ducts: 15,000 m., Expansion joints: 7.250 m.

]]>
Facility Upgrade and Relocation of Underground Process Piping for Gathering Centres (GCs 3, 4, 6, 7, 8, 21, 23, and BSs 140 and 150) at Burgan Area https://malkharafi.com/myproject/facility-upgrade-and-relocation-of-underground-process-piping-for-gathering-centres-gcs-3-4-6-7-8-21-23-and-bss-140-and-150-at-burgan-area-kuwait-epc-contractor-petrofac-ltd-civil-work/ Wed, 03 Oct 2018 11:27:12 +0000 https://mak.nji.ylj.mybluehost.me/?post_type=constructify-project&p=606 Upgrading of the existing facilities consisting of earthworks, roads and associated works, flumes, drainage, swales and evaporation ponds, fences, and buildings.

]]>