Earthworks, including excavation and embankment, contains: Road (6) (ST: 1+000 TO ST: 11+700); Cumulative Fill = 986,839.16 m3; Cumulative Cut = 49,579.61 m3; Road (5) (ST: 1+000 TO ST: 19+780); Cumulative Fill = 1,118,908.30 m3; Cumulative Cut = 440,727.82 m3; Road (4) (ST: 1+250 TO ST: 23+350); Cumulative Fill = 1,823,727.22 m3; Cumulative Cut = 219,506.69 m3
Road Works;
Construction and maintenance of temporary traffic detours necessary for the construction of other works. Demolition of existing pavement. Construction of temporary fence. Roadway work of (51,408 m) including sub-base and base courses, asphalt works, metal works and any other requirements to complete work. Construction of dual (3-lanes and 4-lanes) expressways including parallel collector distributor roads 2 lanes.
Utilities Works;
Construction of culvert for KOC pipelines protection. Construction of a storm water drainage network, including pump stations, culverts, pipes, manholes and gullies. Protection, relocation and construction of water pipelines, sanitary sewers. Protection, relocation and construction of irrigation work including pipes, valves, fittings.
Electrical Works & Instrumentation;
Protection, relocation and construction of electricity network 11kv. Construction of the necessary civil works for the relocation/protection of 33kv electric cables, and coordination with responsible authorities for the required relocation. Electrical work including cables, road crossing ducts, UPVC LT ducts, earth bonding & grounding. Construction of the necessary civil works for the relocation/protection of telephone cables, interfering with the works, and coordination with responsible authorities for the required relocation. Telephone work including UPVC ducts/pipes, manholes, optical fiber cable and sub duct (3×32+2×25) mm. Street Lighting work including cable trays, lighting columns, overhead guide signs, control cabinets. Traffic control system including ATC ducts, Fiber optic cable, CCTV camera, Speed camera system, VMS system, accident detection system.
Finishing & Landscape;
Removal and planting of palms, and removal and disposal for trees and shrubs interfering with the works. Road works, including pavement, sidewalks, signing and marking and concrete barriers
Bridge works;
139 m bridge for Interchange (IC 8). 50 meter bridge for Interchange (IC 7). Concrete works for bridges including blinding, combined footing, piers, retaining wall, abutments, precast parapet. Installation of pot bearing for abutment and piers, pre-stressed strands and pre-stressed concrete deck slab.
]]>Structure Works
2 No. RC Trough (1A & 1B & 2) with tensioned piles, 4 No. vehicular post-tensioned case-in-place Bridges over main trough; 1 no. elevated post-tensioned case in place bridge; 2 no. reinforced concrete retaining walls, pedestrian pre-tensioned Bridges.
Utilities Works
Storm box culvert for storm work and sanitary drainage, utility box culvert, relocation and diversion of existing services and utilities (Fresh & Brackish Water, HT/LT electrical and telephone network);
Al-Mattabah Mosque Works
Design and construction of Al-Mattabah mosque building in the new location which specified by Kuwait Municipality. Demolish the old mosque and to remove the historical items from the old mosque and fix int he new constructed mosque.
Major Quantities
Concrete works: 165,000 m3; Reinforcement: 17,000 tons; Asphalt works: 170,000 m2; Road works: 4,000 m2, Electrical cables 11 kv : 9,000 m; Electrical cables 132 kv: 8,000 m; Water Networks: 21,000 m; Micro-tunneling (sanitary): 1,200 m; Sanitary (open cut): 600 m; Telephone Ducting: 143,000 m; Earthworks (excavation and filling): 1,200,000 m3.
]]>Major quantities
Regular excavation: 400,000 m3; Rock excavation: 110,000 m3, Fill: 3,541,000 m3; rock protection: 217,600 m2; base and sub-base: 587,730 M3; Asphalt: 109,725 m3; Concrete slabs: 2,200 m3.
]]>Major quantities
Regular excavation, Rock excavation, Fill Rock protection, Base and sub-base, Asphalt, Concrete slabs, etc.
]]>