Al Qassim Firing Ranges Project, Saudi Arabia
The scope includes: Infrastructure works (60km x 7m Asphalt road, 155 Km security fence, 122 Km earth berm) and structure building (offices,
775 New York Ave, Brooklyn, NY 11203
Looking for a quality and affordable builder for your next project?
We are happy to meet you during our working hours. Please make an appointment.
The scope includes: Infrastructure works (60km x 7m Asphalt road, 155 Km security fence, 122 Km earth berm) and structure building (offices,
Earth Works; Earthworks, including excavation and embankment, contains: Road (6) (ST: 1+000 TO ST: 11+700); Cumulative Fill = 986,839.16 m3; Cumulative Cut
Construction of three troughs and five bridges, two pedestrian bridges and many related works such as: Road works 3,800 M of at-grade
Construction of 60.00 km road, Earthwork (fill, normal cut, rock cut) Sub-base, Base Course & Asphalt (Binder 6 cm + Wearing 5
All Road works including crossing culverts and piping passing roots, traffic signs, etc.
Construction of earthwork (fill, normal cut, rock cut) Sub-base, Base Course & Asphalt ( Binder 6 cm + Wearing 5 cm), Single
Rehabilitation of existing roads works including walkways, lighting, asphalts, etc.
Two concrete tunnels construction & auxiliary roads works
Road Works (cutting, backfilling, base layers, asphalt layers, etc.)