Project involves the construction, supply and installation of extension of Terminal Group North (TNG) in Riyadh. Civil and electro-mechanical work including water reservoir capacity 10,000 M2, 8 no. valves chambers, 2 no. air valves chambers, 3 pumps split case capacity 3,125 m3/per hour, 1 no. submersible pump pipeline dia. 400-1600 mm.
Civil works include excavation: 5,000 m3, back-filling: 980 m3, plain concrete 384 m3, reinforcement concrete,: 4,355 m3, polyethylene membrane: 2,250 m2
Bituminous paint: 1,200 m2, flexible epoxy poly-sulphfide paint suitable for drinking water : 6,700 m2, roof protection 2,000 m2, plastering: 3,650 m2, internal and external painting: 4,020 m2, 35 different types of valves, transformer, medium tension switch gear (MTSG), motor control center (MCC), main control panel, medium voltage and low voltage cables and lighting works.
Value
$6,435,300Client
Ministry of Water & ElectricityConsultant
Abalkhail Consulting EngineeringLocation
Saudi ArabiaCompletion
2009