Widening Al Ain-Dubai road from dual 2-lane carriageway to dual 3-4 lanes carriageways, demolition and re-construction and widening of existing bridges, underpasses, culverts re-building and lengthening, diversion and relocation of existing utilities, lighting works and landscaping.
Major quantities:
Excavation: 1,834,647 m3, concrete works: 23,183 m3, post-tension concrete: 1,117 m3, asphalt: 873,284 tons; surface water drainage: GRP 200-350 mm dia: 7.64 km.; water works Ductile Iron/AC 450-1600 mm dia: 41.39 km.
Value
$305,196,250Client
Department of Municipality & AgricultureConsultant
Hyder Consulting Middle East Ltd.Location
Al-Ain, U.A.E.Completion Date
Sept 2012