The marina basin will be created by constructing a breakwater on all sides while allowing for an entrance from the North. There are seven main berthing piers joined by gangways at the peripheral and connected to the floating pontoons forming the berths.
The marina is equipped with its own fueling dispenser. Moreover, there is a slipway for the boats and cranes of various sizes for easy handling of yachts for maintenance purposes. At both sides of the marina entrance there is a lighthouse and guard tower from one side, and a helipad from the other side. The lighthouse, guard tower and helipad will all be built on top of the breakwaters.
Onshore, there are three separate buildings. The first building will be used as a workshop for the repair of the officer’s yachts; The second one will be an administrative building for the staff, and the third to be used as a guard house.
Location
Funaitees, KuwaitClient
Kuwait National Guard AuthorityValue
KD 20.0 million