• svg
  • svg
  • svg
  • svg

Head Office in New-York

775 New York Ave, Brooklyn, NY 11203

Request a Quote

Looking for a quality and affordable builder for your next project?

* Please Fill Required Fields *
img

Toll Free

1-800-987-6543

Working Hours

We are happy to meet you during our working hours. Please make an appointment.

    • svg
    • svg
    • svg
    • svg

    Head Office in New-York

    775 New York Ave, Brooklyn, NY 11203

    Request a Quote

    Looking for a quality and affordable builder for your next project?

    * Please Fill Required Fields *
    img

    Toll Free

    1-800-987-6543

    Working Hours

    We are happy to meet you during our working hours. Please make an appointment.

    Addis Ababa International Airport Project – Works Package II, Addis Ababa, Ethiopia

    Construction of a new international terminal building of 60,000 M2 on 3 floors, Facilities include check-in, security, passport control customs, baggage handling system with fully automated 100% hold baggage screening, restaurants and bars, duty-free shopping and lounges, and 5 aircraft boarding bridges, offices for airlines and airport management and operational personnel within the terminal building.

    Major Quantities: Terminal Building (Structures) Fill: 26,000 M3; Piles: 920 No.; Concrete: 25,000 M3; Rebar: 2,500 Tonnes; Foamwork: 70,000 M2; Structural Steel: 350 Tonnes (Envelope): Glass/Metal Cladding Façade: 15,000 M2; Space Frame Roof: 30,000 M2 (Mechanical & Electrical): Standpipe and Sprinkler system; Domestic hot and cold water supply, Roof drainage system, Fully automatic ventillation system, Incoming 100% HBS, Four arrivals collection carousels; Xray Screening: Two in-line Vivid X-rays with OOG; Loading Dock Levellers: 2 No.; Elevators: 4 No.; Escalators: 12 No.; Airbridges: 5 No.; Flight Information Display System: 30 No.; Security System – Card readers and keypads on landside/airside line and all secure areas; TMRS, CCTV: 20 No. Apron (Civil Works): Excavation: 185,000 M3; Fill: 150,000 M3; Crushed Aggregate Layers: 65,000 M3; Asphalt: 15,000 M3; PQ Concrete: 16,000 M3; Earth Static Grounding System

    Construction of new 80,000 M2 airside aircraft apron and taxiway in PQ concrete and asphalt. Construction of landside carparking facilities, access roads and pedestrian walkways. Construction of new fire and potable water supply and storage facilities, sewerage and storm water drainage facilities.

    HV mains and substations, Emergency Standby Generators, Normal and standby Emergency Lighting, fully automatic fire alarm system (Finishes): Stainless Steel Staircase: 12 No.; Partitions: 3,000 lm; Ceramic Tiles: 3,000 M2; Marble Tiles: 40,000 M2; Ceilings: 20,000 M2; Paint: 75,000 M2; Seating: 625 Nos (Accessories): Signage: 150 No.; Airport Counters: 82 No.; Baggage Handling System: Two line departures system with “Car Park and Access Roads (Civil Works): Fill: 150,000 M3; Crushed Aggregate Layers: 20,000 M3; Asphalt: 8,000 M3; Concrete walkways, ramps, structures: 15,000 M3; Drainage: 3,000 lm; Kerbs: 16,000 lm; Topsoil: 10,000 M3; Grass seeding: 60,000 M2; Trees, Plnats, Shrubs: 12,000 No.; Guardbooths: 5 No.; Access Barriers: 6 No; Guardrails: 500 lm; Roadsigns: 25 No.; Flagpoles: 18 No.; Streetlighting: 60 No., etc.. Passenger Capacity 3000 per hour.

    Widening of existing Runway and Taxiway, reconstruction of existing cross taxiway & parts Runway, Taxiway, Apron & Shoulders. Major Quantities: Covered by this contract are: – Removal & disposal of existing pavement: 6,200 M3. – Bitumenous levelling: 18,250 Tons. – Bitumenous base course & surface course: 68,640 Tons; – Bitumenous surface course for overlay: 67,370 Tons. ”

     

     

    • Value

      $75,000,000
    • Client

      Ethiopian Civil Aviation
    • Consultant

      GIBB Limited
    • Location

      Ethiopia
    • Completion Date

      2002
    To Top